Customer: Westinghouse Savannah River Co.
Site: Savannah River Site, Aiken SC
Project Scope:
Project requires deconnable Modular Panel Facility for Decontamination of Spent Fuel Shipping Casks.
Containment of High Pressure Water Spray and Steam Cleaning decon system airborne and effluent discharge.
HEPA air filtration system and liquid effluent collection system required to support project.
Facility capable of passing leak rate criteria and operational testing to customer requirements.
Project Performance:
NFS-RPS designs and delivers a turn-key modular facility:
Deconnable Modular Panel Containment System
1 Module, 18’ Wide x 24’ Long x 12’ High, Stainless Steel Panels
Welded Stainless Steel Drip Pan Floor Container System with Grid Decking
Liquid collection and pump transfer system
Spent fuel cask support stand
12’ Wide x 24’ Long Roof Access Opening
HEPA ventilation system designed and delivered to provide 23 room volume changes per hour and impose laminar air flow for vapor removal.
Facility assembled in 2 weeks.
Facility air leak tightness test: =<0.1 inch water column.>
Applications engineering, radiological engineering, mechanical design,
Project management and cost control expertise applied.